Robot Arm

MAE189 Team 2: Robot Arm

 

Background: As part of the MAE189 Capstone project our team will design, build, and test a Robot Arm. Its intended function is to perform automated tasks in a precise and repeatable manner.

 

Goal and Objectives​:

A key function of our Robot Arm design is the implementation of a proxy arm to control and program the arm's motion. The goal is to create an intuitive user interface that can quickly repurpose the arm for the task at hand.

 

  • Week 2: Identify viable forms for the Robot Arm
  • Week 5: Design/manufacturer prototype for verification and validation of our design requirements.
  • Week 7: Final design of aesthetics and implementation of Proto 1 revisions, and testing.
  • Week 8-9: Manufacture final design.

 

 

Team Contact(s):

 

Project Administrators:

Advisor: David A. Copp E-mail: dcopp@uci.edu

Sponsor: Shorbagy Mohamed E-mail: mohamem2@uci.edu

 

Project status: 
Active
Department: 
MAE
Term: 
Spring
Academic year: 
2022-2023
Spring Poster: 
Author: