The city of Rosemead is in need of a bridge replacement that will carry Eureka Avenue traffic over State Route 10 (SR-10). When completed, the replacement will span 307’, accommodate for two lanes of traffic in each direction, and provide a 16.5' clearance below the bridge. The team will first termine the bridge type selection and finalize the project with its construction documents.
Course Department:
CEE
Term(s):
Fall
Winter
Spring
Academic Year:
2019-2020
Winter Poster:
Teammates:
Jackie li
Nathan Lindemer
Sina Yadollahi