The Modesto Area 2 Stormwater to Sanitary Sewer Cross Connection Removal Project is will remove three sanitary sewer to storm drain cross connections, which are illegal connections of storm drain inlets to the sanitary sewer system installed to relieve flooding. The project will infiltrate stormwater and recharge groundwater and reduce the surcharging of sewer lines, reduce the number of Sanitary Sewer Overflows, improve water quality for Dry Creek, and the Lower Tuolumne River. The project will also rehabilitate Garrison Park, it’s soccer and baseball fields, and add a basketball court in a disadvantaged part of Modesto. The project will include a hydrologic analysis of the project area, hydraulic analysis of the storm drainage system, evaluation of the proposed retention basin, and prepare construction documents for the project.

Project status: 
Active
Department: 
CEE
Term: 
Fall
Academic year: 
2018-2019